Kenfreight & HLLEA Mega Lift at Olkaria Geothermal Power Plant Phase 5

With Heavy Lift Logistics East Africa, HLLEA, a 100% Kenfreight subsidiary specialized in engineering and out of gauge transport, the Kenfreight Group is a leading player for special operations logistics in East and Central Africa. Today we join the group executing another special logistics project at Olkaria Geothermal plant phase 5. The project included a mega lift of 2 150,000 kg turbo generators.

BLADE RUNNERS: The KENFREIGHT – Kinangop Logistics Project

Kinangop is a wind farm site about 120kms past Nairobi near the Aberdare mountains. In terms of extreme out of gauge dimensions and the sheer amount of special loads, this is one of the biggest project ever undertaken in East Africa. Components are between 54MT and 22m long / 4.7m diameter upto 40m long (blades) or 60MT (nacelles). Total 269 out of gauge loads.

Leave a Reply

Your email address will not be published.