Uganda Electricity Transmission/ CAMCE LOGISTICS
Project

Uganda Electricity Transmission/ CAMCE LOGISTICS

The project is ongoing with consignments being delivered to 3 different sites in Uganda i.e. Namanve South, Mukono and Iganga. (i) Already delivered safely to respective sites in Uganda are:- 3×40 HC STC PKGS of equipment and material 5×40 63 STC PKGS of equipment and material 14×40 Container STC 150 PKGS of equipment and material...

Olkaria V Geothermal Power Development Project
Project

Olkaria V Geothermal Power Development Project

Kenfreight Group last year in December signed a contract to handle Olkaria Geothermal project together with UTC and Tatsumi of Japan. The signing was done at the headquarters of Kenfreight in Mombasa, MSC Plaza. The mandate is Clearance at the Port of Mombasa and transportation to Project site in Olkaria. The project dubbed Olkaria V...

Kinangop wind farm for Iberdrola Engineering
Project

Kinangop wind farm for Iberdrola Engineering

Kinangop is a wind farm site about 120kms past Nairobi near the Aberdare mountains. In terms of extreme out of gauge dimensions and the sheer amount of special loads, this is one of the biggest project ever undertaken in East Africa. Components are between 54MT and 22m long / 4.7m diameter upto 40m long (blades)...

Ngong wind farm phase II
Project

Ngong wind farm phase II

Chartered a vessel on behalf of the supplier GAMESA for seafreight. Participated in transport of 25m long blade sections using our specialized blade trailers.

Various heavy lift jobs
Project

Various heavy lift jobs

Carried various OOG components on our specialized trailers including 70MT dump trucks and 112MT cement shell

Cement mill shell to Wazo Hill
Project

Cement mill shell to Wazo Hill

End 2013, on request of SPIF Logistics, we dispatched a 12-line modular trailer to Dar Es Salaam to complete delivery of a 112MT heavy cement mill shell to a nearby cement factory. Challenges with government approvals were overcome and the shell delivered intact early 2014.

UTC
Project

UTC

Moving of a power plant from Mwanzia in Tanzania to be shipped out back to Gaborone