Uganda Electricity Transmission/ CAMCE LOGISTICS
Project

Uganda Electricity Transmission/ CAMCE LOGISTICS

The project is ongoing with consignments being delivered to 3 different sites in Uganda i.e. Namanve South, Mukono and Iganga. (i) Already delivered safely to respective sites in Uganda are:- 3×40 HC STC PKGS of equipment and material 5×40 63 STC PKGS of equipment and material 14×40 Container STC 150 PKGS of equipment and material...