UGANDA/ MEGA POWER SUB-STATIONS

UGANDA/ MEGA POWER SUB-STATIONS

The project is ongoing with consignments being delivered to 3 different sites in Uganda i.e. Namanve South, Mukono and Iganga.

(i) Already delivered safely to respective sites in Uganda are:-

  • 3×40 HC STC PKGS of equipment and material
  • 5×40 63 STC PKGS of equipment and material
  • 14×40 Container STC 150 PKGS of equipment and material
  • 17x 40 Containers STC PKGS of equipment and material

(ii) Work in process

9×40’ OT, 1X20’OT & 5X20’ DRY & 1X20’ DRY CNER STC 127 PKGS OF EQUIPMENT AND MATERIALS FOR INDUSTRIAL PARKS

Leave a Reply

Your email address will not be published.